Loveland Water and Power will perform a planned outage in the Big Thompson Canyon. The outage will take down the entire canyon from County Road 27 to Waltonia.
The section of US Highway 34 between the Dam Store and Estes Park is closed and will remain closed until late May 2018. We have all of the details for you.
The Colorado Department of Transportation and Kiewit Infrastructure Co. are opening Highway 34 in the Big Thompson Canyon later this week. We have details.
Just prior to the Memorial Day weekend, CDOT plans to open US Highway 34 for everyone to travel. The canyon remains closed to through-traffic until then.
The Colorado Department of Transportation will temporarily open U.S. 34 to all drivers traveling between Estes Park and Loveland over the Thanksgiving Holiday
144 people died in the flood. A memorial was installed in 2001 to mark the 25th anniversary. 15 years after its installation, I finally went to see it.
The Colorado Department of Transportation plans to close U.S. Highway 34 for 9 months to repair damage done by the flood in 2013. We have the latest details.
There have been some heart wrenching photos coming from the flooding of the Thompson Canyon and a lot of people have been asking about a beloved store that is pretty much on the banks of said river; The Dam Store.
The flooding we’re experiencing right now is some of the worst in our area’s history. At least 17 miles of highway 34 in the Thompson Canyon will have to be rebuilt after being washed-out or damaged. With the snowy season looming on the horizon, just how long is it going to take before that route is back to normal?